FCC Flooded With Opposition to NextNav’s GPS Backup Proposal
Broadband Breakfast
APRIL 30, 2025
broadcast signal and would not require dedicated spectrum and infrastructure; and, eLoran, which would upgrade the original Loran system operating in the 90–110 kHz range. BPS would use existing Next Gen TV infrastructure to embed precise timing data in over-the-air television signals.
Let's personalize your content